Archive for May, 2009

Daily Scrum 18 – 19.5.2009

Work done

  • Edited the Figures for the article 2
  • Ended the Sprint and made the Sprint review
  • Set new Sprint goals and started the new Sprint
  • Set up new Sprint Backlog

Issues

  • None at the moment

Will work next on

  • Making article 2 more concise
  • Going through literature for article 3

Estimated Sprint work left: 5.2

Add comment May 19, 2009

Sprint Review and Starting the Next One

Made the Sprint goal – a day late and only just, but worked hard and made it.

I have to start taking the work estimations seriously, because I’m not going to be able to increase my velocity at will. On the other hand the deadlines for conferences are set; I’m just going to have to find the time to work more on this for the next month at least.

The typical burn chart shape for me looks like a box shape – straight line followed with a straight drop. I have to keep this in mind — I’m not going to get a lot of tickets completed at the beginning of a sprint, but later on I’ll be able to check a lot more.

So, onto the next sprint. Next one will be a shorter one — the first deadline is May 31st and I’m ending my next sprint then. Sprint Goals are: 1) To produce and deliver second version of the process model article. 2) Produce first draft of the process control article. Text is to be used in the 3rd result chapter as well as the finished article.

Add comment May 17, 2009

Daily Scrum 17 – 16.5.2009

Work done

  • Wrote text for the article:
    • conclusions (and added some text to results too)
    • results from peatland adventure
    • abstract
    • method
    • a couple of small paragraphs at the beginning of chapters
    • references
    • terms and ACM categories
  • Edited the article:
    • Shortened the literature chapter
    • Started working on the figures

Issues

  • article still a bit too long
  • reached end of the sprint (gave myself one extra day)

Will work next on

  • The figures of the article
  • Sprint review, starting the next Sprint

Estimated Sprint work left: 0.5 (added about 0.5 yesterday :) )

Add comment May 16, 2009

Daily Scrum 16 – 15.5.2009

Work done

  • Wrote text for the article:
    • game production process description
    • SPEM 2.0 description
  • Edited the article:
    • Introduction section
    • Started on the Literature section

Issues

  • Potentially something with the LaTeX article template

Will work next on

  • Rest of the article work (in order):
    • Edit the literature section
    • Write the results (Peatland Adventure)
    • Write the Conclusions
    • Edit the Case Project Descriptions
    • Add the List of References
    • Edit the Figures
  • describing the game production process

Estimated Sprint work left: 2.45

Add comment May 15, 2009

Daily Scrum 15 – 12.5.2009

Work done

  • Wrote text for the article:
    • first version of the process improvement literature chapter
    • background section
    • experiences and results for 3 of the case projects
    • completed the process descriptions for learning sciences, software engineering
    • peatland adventure process description

Issues

  • Still in a bit of a hurry to end the Sprint

Will work next on

  • describing the game production process
  • writing conclusions
  • editing, final version
  • references

Estimated Sprint work left: 5.25 (3.5 if some features are dropped)

Add comment May 12, 2009

Daily Scrum 14 – 8.5.2009

Work done

  • Wrote the process descriptions for 3 of the 4 case projects
  • Set up new trac on ProjectLocker and uploaded the stuff from previous trac project to it (thanks, support!)
  • Published process model diagrams for the rest of the case projects

Issues

  • Too much work in the Sprint backlog?

Will work next on

  • Describing the process of ‘Peatland’ case project
  • Creating new tickets for the revising part of the articel work (i.e. I got my process figured)
  • decribing the game prod. and software engineering processes

Estimated Sprint work left: 8.25

Add comment May 8, 2009

Daily Scrum 13 – 5.4.2009

Work done

  • Took a look at the ACM LaTeX article template and set it up for the article
  • published the Gameli process model diagrams for use with the article
  • made the first draft of Gameli process description
  • Searched alternatives for DevJaVu

Issues

  • Working both on the article text and corresponding chapter texts at the same time — not much progress on either
  • DevJaVu is going offline — need to migrate trac elsewhere

Will work next on

  • Moving the trac server elsewhere
  • Clearing up the process of writing the article
  • Publishing the rest of the process model diagrams

Estimated Sprint work left: 8.75 (none of the tickets are closed yet)

Add comment May 4, 2009


Pages

AnttiKi’s Twitter

About Us

Blogroll

Category Cloud

AGL business Call for Papers Daily Scrum Design Events Finland Games Jyväskylä Meta Nordic PhD Research Serious Software Uncategorized

Meta

Blog Stats

Archives